Pakal Dul HE Project (1000 MW) is proposed on river Marusudar, a tributary of river Chenab in district Kishtwar of J&K state and is about 45 kms from Kishtwar. The project envisages construction of a 167 m high Dam, an underground Power House with 4 units of 250 MW each.
Project Features
| Location |
Village Drangdhuran in Kishtwar District of Jammu & Kashmir |
| Dam |
167m High Concrete Face Rockfill Dam |
| HRT |
2 Nos, 7.2m dia Horse Shoe/Circular shaped & 9.6 km each |
| Power House |
Underground 4 units of 250 MW each (1000 MW) near village Dul about 26 kms from Kishtwar |
| Tail Race Tunnel |
4 nos, each of 125 m length and 5.5 m dia |
| Net Head |
397.30 m |
| Design Discharge |
309.88 cumec |
| Annual Energy |
3230 MU in 90% dependable year |
| Project Cost |
Rs 8112.12 Crores (March 2013 price level) |
| Completion Period |
66 months |
| Tariff |
First year- Rs 4.54 per unit / Levellised Tariff – Rs 4.28 per unit |